How Far Ahead Should You Order Custom Event Merchandise?
Photo by Maria Orlova on Unsplash
"How long does it take?" is the first question almost everyone asks, and it's the right one. Custom merch is made for you, which means it can't be pulled off a shelf the week before. The good news is that with a little planning, the timeline is very manageable.
Here's how it usually breaks down, and how to work backwards from your date.
The Short Answer
Allow 8 to 10 weeks from first conversation to having pieces in your hands. If you'd like a physical sample, the piece is completely new, or the event is overseas, allow longer.
Where the Time Goes
Brief and ideas (the first week). You share your vision: the event, the date, rough quantities, colours and any references. We come back with ideas and options.
Mock-ups and pricing (around a week). Every piece is mocked up in your colours and style, with pricing. This is where you refine placement, sizing and finishes.
Sampling, if you'd like one (at least two to three weeks). Physical samples are optional. For new or more complex pieces they can be worth the time, as they're the best way to check colour, fabric and finish before committing to the full run. Just allow at least two to three extra weeks.
Production (about four weeks). Once the designs are approved, production begins. This is the longest single stage and the one that's hardest to rush.
Shipping (varies). Delivery time depends on where the pieces are going. For events abroad, build in extra time.
Work Backwards From the Right Date
The date that matters isn't always the event date. It's the date you need the pieces in hand.
For a wedding overseas, that's usually before you fly. For a brand activation, it might be a few days before so the team can set up. For welcome bags, it's when they need to be packed. Pick that date first, then count back.
What Slows Things Down
A few things add time more than anything else:
- Waiting on artwork or logo files. Have a clean version of your logo or monogram ready, ideally as a vector file.
- Changing direction after mock-ups are approved. Small tweaks are fine; a new design means a new mock-up.
- Deciding quantities late. Production can't start until numbers are locked in.
- Sizing for apparel. Collect sizes early if you're ordering tees, sweats or robes.
If You're Short on Time
Rush orders can sometimes be accommodated, but it helps to be flexible. Choosing pieces that don't need a physical sample, keeping colours simple, and prioritising the one or two pieces that matter most will give you the best chance.
The earlier you ask, the more options you'll have. Even if your event is months away, a quick conversation now can save a scramble later.
The Takeaway
Start 8 to 10 weeks before you need your pieces, work back from the date they need to be in hand, and have your files and numbers ready. That's the simplest way to get exactly what you pictured, without the stress.